GD427 MK IV

GD427 MK IV
What my car should look like when finished - Stoneleigh 2015

Monday 16 January 2017

Gearbox Tunnel & Brake Connector

Since I thought that the fuel system was complete, I decided to fit the Gearbox Tunnel Sheet.  This was just set on, and fixed using M6 x 20mm Set Screws.  In previous photos, you may have noticed that I used some black sealer to put a bead down between the sheet and the chassis.  I then put on the self adhesive foam that was provided by GD.



I then mounted the brake pipe / clutch bracket.  I still need to finalise what fittings I am going to use for the clutch bleed.



I have since removed the tunnel sheet again to alter the positioning of the fule supply hose and Y-Piece as per the previous post.


No comments:

Post a Comment