GD427 MK IV

GD427 MK IV
One of my first drives out - 8th September 2025 (St Ninian's Isle - Shetland)

Sunday, 11 December 2016

Heater Pipes - Continued

After making up wooden clamps and the use of duct tape, I made up stainless steel brackets for the heater pipes which go from the water pump at the driver's side across the car to the passenger's side.



I had a friend come over to TIG weld the brackets to the stainless pipes for me.  I then used some pickling paste to clean the weld after.

This then enabled me to finally bolt up the cross brace to the chassis.  I just have to install the 90 degree hoses and also the heater valve.