Since I thought that the fuel system was complete, I decided to fit the Gearbox Tunnel Sheet.  This was just set on, and fixed using M6 x 20mm Set Screws.  In previous photos, you may have noticed that I used some black sealer to put a bead down between the sheet and the chassis.  I then put on the self adhesive foam that was provided by GD.
I then mounted the brake pipe / clutch bracket.  I still need to finalise what fittings I am going to use for the clutch bleed.
I have since removed the tunnel sheet again to alter the positioning of the fule supply hose and Y-Piece as per the previous post.
No comments:
Post a Comment